UK WATER INDUSTRY RESEARCH

 

 

Re-use of Excavated Material in Trench Reinstatements in the Highway

 
Price: £11  

The policy and practice of material re-use for highway reinstatement are investigated.  Although, in some cases, cost savings can be obtained through greater material re-use this needs to be considered against possible premature failure.  Approaches to the use of such material are described.  The report provides a basis for water companies to review the use of excavated material and consider whether changes would be beneficial.

 

 

UKWIR Reference :- 95/WM/01/9Published Date :- 28/03/2006
Retail Price (£) :- 11ISBN :- 1 84057 108 X